• Electrical service provided by a dedicated substation that is fed from two independent 5MW (10MW total)

• Duke Power grids, each providing redundant three-phase 13.2kV power distributed throughout complex

• One 600-ton and two 500-ton centrifugal water chillers and cooling tower

• 400 KVA backup generator with 440 volts serving building's life-safety systems

• Two 700-HP high-pressure steam boilers using natural gas or fuel oil (two 30,000-gallon above-ground tanks) produce supply steam at 60 psig for distribution throughout the facility

• Easy roof access to MEP systems via perimeter vertical chases for fit-up, future expansion and service access

• 100% single pass-through air supply for laboratories

• Zoned distribution of the supply and exhaust air for the seven laboratory wings (three floors at 6,100 SF each)

• Johnson HVAC system monitors with pneumatic controls

• Redundant air compressor service

• Individual power distribution for laboratories

• Telecommunications with T-1 and T-3 fiber optic backbone

• High security access system with card reading and CCTV functionality

• Fire protection and sprinkler system throughout, with service from 6" main water loop

• 12" and 8" water mains independently feeding 6" loop through facility